The ideas also include a huge battery at the positioning, to make sure excessive electrical power is often stored with the night, and a 220 kV transmission line which can connect the challenge for the North Star sub-station, close to where by a different 100 MW solar challenge can also https://citypointsolar.com.au/how-to-find-the-best-solar-installers-in-perth-a-complete-guide/