Iii) any liability that the principal contractor may possibly put up with or incur under a statutory warranty in connection with the trade is effective. (k) Recordkeeping and writing the inspection report. Labeling of samples and keying sample identification to sampling area; recommendations on sample labeling; detailing of ACM stock; https://nowbookmarks.com/story13582110/asbestos-removal-gympie-for-dummies